

Day 1 - Walls are Going Up!
Construction has started on our new space in 4S Ranch!
On Friday, the general contractor "snapped the lines," which means they drew the layout on the floor of the space. We walked the space to make sure that everything looked right. The photo below shows where the walls will be for the exam rooms and the hallway handwashing station.

A Walk Through the New Space
Since choosing "finishes" (flooring, paint colors, fabric, etc.) with our interior designer Kelly Hinchman, we’ve been working on finalizing the Construction Documents (CDs), which are the set of blue prints the construction team will use. The CDs are incredibly detailed, down to where each electrical outlet will be placed. Now we can close our eyes and visualize walking through the finished space.

Kids’ NewsDay to Benefit Rady Children’s Hospital
We had so much fun this morning! Our entire staff participated in supporting a good cause and sold newspapers to raise money for “the kids” of Rady Children’s Hospital.